During the glazing project on a towering 65-storey building located in the bustling heart of Melbourne’s Central Business District, we collaborated with COLAB to achieve optimal results. As part of the project, we were tasked with removing 20 glass panels that had developed cracks and replacing them with new ones.
To execute the task with precision and efficiency, we utilised a number of advanced tools and equipment, such as rope systems, electric ascenders (winches), and electric suckers. These tools not only helped us to safely remove the damaged glass panels, but also ensured that the new ones were installed securely and with minimal disruption.
Throughout the project, safety was our top priority, and we took every precaution to ensure that our team and the public were protected from any potential hazards. Thanks to our meticulous planning, attention to detail, and commitment to safety, we were able to complete the project successfully, on time, and to the highest standards of quality.
Give us a call or send through an inquiry to learn more about our rope access glazing services.